PHASE
10A: EXTERIOR TRIM
Brick veneer is underway on the side of the house.
Brick veneer is complete on the sides and rear of the house, ready for cleaning and final touch up. The brick exterior provides a durable, low maintenance finish that will last the life of the structure.
Plastic tubing is
installed to provide weep holes to remove any moisture that works
its way through the brick. These weep holes are integrated with the
Delta Dry drainage plane to keep moisture out of the building
structure. |
|