HOME | ABOUT THE SHOWCASE  | WHAT IS EARTHCRAFT? | CONSTRUCTION | PRODUCT SPONSORS | MEDIA SPONSORS



PHASE 10A:
EXTERIOR TRIM
 

Brick veneer is underway on the side of the house.


Brick veneer is complete on the sides and rear of the house, ready for cleaning and final touch up. The brick exterior provides a durable, low maintenance finish that will last the life of the structure.


Plastic tubing is installed to provide weep holes to remove any moisture that works its way through the brick. These weep holes are integrated with the Delta Dry drainage plane to keep moisture out of the building structure.
 

HOME | MEDIA SPONSORS | PRODUCT SPONSORS
ABOUT THE SHOWCASE | WHAT IS EARTHCRAFT? | CONSTRUCTION